Conceptual engineering and FEED

Define the solution before developing the detail.

What we do

Conceptual engineering and front-end engineering design — FEED — progressively develop scope maturity. Studies structure technical decisions and establish the basis for planning, procurement and subsequent design.

Progress with a shared design basis

Early development compares alternatives and determines the information each decision requires. A consistent design basis connects operating needs, process criteria and site constraints.

The level of detail in deliverables is agreed for each stage. Assumptions and exclusions must remain visible to prevent preliminary definition from being interpreted as final design.

Service scope

The scope is defined according to asset condition, project stage and available information.

Concept and alternatives

Configurations, technologies and requirements are examined to select a development option. Conclusions explain the criteria used and the matters that remain open.

  • Objectives and preliminary basis
  • Comparison of alternatives
  • Constraints and study requirements
Technical capabilities

Develop scope maturity before detailed design

Selection of the preferred option

Configurations are compared against common capacity, utility, site and operating conditions. Criteria and assumptions explain why an option is taken forward and what information could change the decision.

  • Options matrix
  • Balances and major equipment
  • Constraints and uncertainties

Preparation for the next stage

Front-end engineering design consolidates diagrams, layouts and interfaces. Deliverables must indicate their maturity and outstanding checks so that procurement and subsequent engineering use a consistent basis.

  • Coordinated design basis
  • Technical package requirements
  • Decision and outstanding item register

Deliverables and coordination

Information for decision-making

Deliverables are agreed when the service is defined. The bases used, results and outstanding checks are documented so that the information can carry through to the next stage.

  • Options study and technical recommendation
  • Design basis and scope definition
  • Register of assumptions and stage deliverables
Background information to get started

An initial review confirms what information is available and what needs to be completed. To prepare for that discussion, it is useful to have:

  • Capacity and operating requirements
  • Site, resource and utility information
  • Selection criteria and decision deadlines

Let's discuss your next project.

Contact us