Commissioning

Preparing for handover from the earliest decisions.

What we do

Commissioning connects construction completion with readiness to operate. System-based planning organises verification, testing and handover documentation in line with defined acceptance criteria.

Considering operations from the outset

The handover sequence must recognise system dependencies and the information needed to verify their status. Incorporating these requirements during planning helps guide construction and the tracking of outstanding items.

Preparation covers new facilities, modifications and return to service. Each activity is defined within approved procedures and the responsibilities of the project and operations teams.

Service scope

The scope is defined according to asset condition, project stage and available information.

System-based planning

System and subsystem boundaries are defined, dependencies are reviewed and completion and handover criteria are established. The plan connects construction milestones with operational needs.

  • Boundaries and interfaces
  • Handover sequence
  • Acceptance criteria
Technical capabilities

Preparing systems for handover

Completion and pre-commissioning

System boundaries provide the basis for organising inspections and completion records. Status is confirmed through evidence, with agreed criteria for distinguishing outstanding items and the requirements of the next stage.

  • System boundaries and hierarchy
  • Inspection and test records
  • Punch-list classification

Commissioning and operational readiness

The testing sequence is coordinated with utility availability and process requirements. Operations receives information on configuration, results and outstanding items requiring follow-up.

  • Test procedures linked to requirements
  • Documentation and operational readiness
  • System handover and acceptance

Deliverables and coordination

Information for decision-making

Deliverables are agreed when the service is defined. The bases used, results and outstanding checks are documented so that the information can carry through to the next stage.

  • Commissioning plan and sequence
  • Verification matrix and punch-list register
  • Handover dossiers and completion status
Background information to get started

An initial review confirms what information is available and what needs to be completed. To prepare for that discussion, it is useful to have:

  • Diagrams, equipment lists and system boundaries
  • Construction programme and vendor deliveries
  • Operating requirements and acceptance criteria